LEED Gold Certificate:
Legends Toyota – Kansas City, KS
School of Leadership Studies Building – Kansas State University
BKD Headquarters Building – Springfield, MO
CAB Dining Facility – Ft. Riley, KS
LEED Silver Certificate:
Whiteside Dining Facility – Ft Riley, KS
PNC Bank – Overland Park, KS
Training Support Center – Ft Leonardwood, MO
Restaurants
Churches
Medical Office Buildings
Retail
Office
Schools:
Kansas State University School of Leadership Studies
Housing - Condo’s/Lofts
Warehouse
Banks
Hotels
Car Dealerships
Superior Chevy
Government work:
Springfield, MO
Owner/Developer: Opus Northwest
Contractor: Opus
Northwest
Description:
This design/build 120,000 Sq.Ft. office build project was awarded the USGBC’s LEED GOLD certification. The 4-story office building utilizes a low-temperature VAV distribution system. The cooling plant consist of (2) 150-ton packaged penthouse units with integrated energy recovery and demand control ventilation.
Manhattan, KS
Owner/Developer:
Kansas State University
Foundation
Contractor: Opus
Design/Build
Description:
The project was the first LEED certified higher education building in the State of Kansas, and winner of the DBIA’s Design/Build project of the year. The HVAC system utilizes digital unloading scroll compressor technology for superior energy performance and a VAV air distribution system
Lenexa, KS
Owner/Developer: ThermoFisher
Contractor: Geis Construction
Description:
The design/build 20,000 sq.ft cleanroom expansion to biomedical production facility was designed and completed within a 6-month project schedule. The HVAC systems incorporated HEPA filtration, desicant dehumidification systems, dust collection, and room pressurization controls.
Kansas City, KS
Owner/Developer: LADCO
Contractor:
Taylor-Kelly
Description:
95,000 sq.ft.
design/build
office building for Kansas City,
Kansas School districts incorporates a full
commercial kitchen, 1000 sq.ft Data Center, and Maintenance
Facilities.
Fort Leonardwood,
MO
Owner/Developer: United States Army Corps of Engnieers
Contractor:
Zieson Construction
Description:
A 100,000 sq.ft. building that accommodates warehouse and distribution for the Ft. Leonardwood; as well as a combination metal/wood fabrication shop, and digital training facilities. Metro Air designed and installed the dust collection, plumbing, compressed air, industrial heating, and VAV cooling systems for the facility.
Ft Leavenworth, KS
Owner/Developer: United States Army Corps of Engnieers
Contractor: Mortenson Construction
Description:
Complete renovation of mechanical systems for this 80,000 sq.ft., 4-story, historical building at Ft Leavenworth. Designed and constructed all new 200-ton chilled water plant with variable flow pumping, a new boiler plant serving both heating hot water and domestic water systems, and Variable Air Volume (VAV) air handling units. The new systems were designed to exceed minimum energy efficiency requirements as outlined in ASHRAE 90.1-2007.
© 2012 MetroAir